Start at 1 MW.
Scale to 100.
Your first megawatt should not wait on a seven-year interconnection queue. We start you on capacity that exists today, develop the power the site will need, and scale with you as your compute grows.
1 ingot = 1 MW · copper live on the existing feeder · solid, next tranches · dashed, the ramp the site is chosen for
Nobody wants to sell you your first megawatt.
Large developers want a signed hundred-megawatt campus before they start. Utilities queue the biggest requests first. So the team that needs one megawatt now — and a hundred in three years — gets told to wait for both.
Every large-load tariff gate sits far above a 1–5 MW entry. The dashed ramp grows on a site already yours. Fifteen-year terms, take-or-pay and per-MW collateral live past the gates. Our review of 65 large-load tariffs across 34 states, 2026.
Your first tranche clears the gates
Sixty-five large-load tariffs across thirty-four states, none reaching down to single-digit megawatts. Entering below them means no fifteen-year term, no take-or-pay and no per-megawatt collateral on day one.
Our review of 65 large-load tariffs across 34 states, 2026An ordinary service request
At this size it is a commercial new-service application to the distribution utility. No cluster study. No ISO interconnection queue.
Sited for the hundred, energised for the one
We select sites with the land, fibre and grid position to reach 100 MW, then energise the first tranche on capacity available today. The scale-up is planned from the start, not retrofitted.
The grid is the bottleneck, and it is getting worse.
Against an all-time system peak of 24,000 MW. More demand queued than the utility has ever delivered.
Illinois Commerce Commission order, March 2026Distribution transformers run 18–24 months. If a site needs new substation capacity, that is the clock.
Our review of utility and equipment lead times, 2026First tranche inside existing feeder capacity. Later tranches planned into the site from day one.
Our own development specTwo clocks. We start you on the fast one.
A site that needs new substation capacity waits on a power transformer. A tranche inside an existing feeder does not. The first is the reason the queue exists; the second is where a first megawatt comes from.
Our review of utility and equipment lead times, 2026What we do
Two things, developed as one project: the data centre, and the power that lets it grow. Construction and engineering of record sit with specialist firms.
Data Centre & Sovereign Compute
From a first megawatt on a prepared site to a hundred-megawatt build-out, on land chosen to carry the whole ramp.
- Prepared sites: existing service, fibre and land — capacity confirmed with the utility in writing
- Modular 1 MW-class blocks; later tranches planned into the site from day one
- Campus and institutional hosting — capacity for the host, the rest leased out
- Sovereign compute: infrastructure inside your own state, not a cloud subscription
A 1 MW-class block: eight racks, closed coolant loop, no water draw. Modeled configuration; figures are site-specific.
Energy for the data centre
We develop the power ourselves. Whatever the site needs to reach the ramp — sized, permitted and connected as part of the same project.
- Grid interconnection strategy and the utility works to energise each tranche
- Battery storage, fuel cells, solar and on-site generation, specified to the load
- Permitting, fire and hazard mitigation, and the county relationships that decide timing
- Development only: engineering of record, EPC and operations sit with specialist firms
One block, every source it may draw on: grid tap, storage, solar, fuel cells, standby generation.
AI workforce training, readiness assessment, and build & operate are delivered by our parent company.
TechOps.AI ↗Training programme →How it works
Each tread is a tranche; each riser is a supply change. Step values are illustrative tranches, not commitments.
Define the ramp
What you need now, what you expect in three years, and which entity signs.
Match a site
Available today for tranche one, with headroom and grid position for the full ramp. Capacity confirmed with the utility in writing.
Structure
Lease, credit support and the works needed to energise, with funding responsibility explicit.
Energise & expand
Build by specialist firms. Later tranches follow the plan rather than restarting it.
Numetal is new. The people running it are not.
A development company is its principals and the specialists it assembles. Here are ours, and what they have built before.
Ashish Krishna
Power systems & interconnection
Leads capacity assessment, interconnection strategy, technical design and permitting. Has developed 50 MW of solar; 250 MW / 1 GWh of storage in development across Massachusetts and Texas.
Girish Kapur
Land, sites & feasibility
Sources land, sites and campus opportunities, and holds the municipal, utility and landowner relationships that decide whether a project is possible. Previously at Syngenta; advisory board member in Aurora, Illinois.
Massachusetts and Texas
Built and sold or fund-acquired
Current active work
Figures are the principals’ own record, not Numetal’s. Developed means built and sold or acquired by a fund. In development means the land qualifies, permits are obtainable, interconnection is applied for, and there are no major red flags.
What we are working on now
In discussion with two universities to host data centre capacity — partly for their own use, partly leased out — with an integrated energy-reuse component. Named once agreements are signed.
We develop. Specialists build.
Teams are assembled per project. These scopes are always engaged from outside, which keeps our judgement independent of who profits from construction:
- Civil and electrical engineer-of-record
- Environmental, wetlands and geotechnical
- ALTA survey and land services
- Fire PE and NFPA 855 hazard mitigation
- Power-system study modelling
- EPC, construction and O&M
Who we serve
Start from where you sit.
Data Centre Customers
Power for the compute you are buying now, on a site that can carry what you buy next.
Read →Investors
Equity and debt for storage and distributed data centre projects. Two risk profiles, assessed separately.
Read →Universities & Institutions
Campus land, power and fibre turned into revenue — with a workforce programme alongside it.
Read →Tell us the megawatts and the date.
What you need now, and what you expect to need. We will tell you whether it is findable, and what it depends on.